PSPCL Recruitment 2017 for Freshers & Any Graduate – Apply Online

PSPCL Recruitment 2017 for Freshers & Any Graduate – Apply Online


Company Name: Punjab State Power Corporation Limited (Pspcl)


Company Profile:
History:
PSPCL was incorporated as the company on 16-04-2010 and was given the responsibility of operating and maintenance of State's own generating projects and distribution system. The business of Generation of a power of erstwhile PSEB was transferred to PSPCL.


Milestone:
All the power Stations operated at their best ever plant load factor since their installation. KD FSF ds Net Power generated during 2008-09 is 37222 Million units, which is more than 2006-07 by 2238 Million Units resulting in 6.40% increase in two years. The 1980 MW (3x660) Talwandi Sabo Power Project awarded to M/s Sterlite Energy Ltd. Mumbai on 4.7.08 and PPA signed on 1.9.08. Power purchase agreement with M/S GVK for installing 2x270 MW thermal power station at Goindwal Sahib signed on 26 May 2009. The foundation stone has been laid and the company has started the construction.


4.76 lakh new connections including 61849 No. tubewell connections were released during 2007-09. 24 Hrs. Urban pattern supply made available to 12428 villages and 6158 Deras/ Dhanies with 5 or more houses. To help SC & BPL consumers, free monthly consumption up to 200 units allowed for the connected load of 1000 watts w.e.f. 12-10-06 instead of earlier 500 watts. Strict measures have been taken to reduce power theft. Disciplinary action taken against the erring employees and 5 numbers Anti Power Theft Police Stations have been set up. New technologies like electronic meters, remote control of transformers, remote meter reading and HVDS system for AP/ Industries introduced. 20.29 lakh meters out of 55.98 lakh General/ Industrial Consumers shifted out of their premises as on 31.3.09 to curb theft of energy. All these measures have helped in reducing losses by 4% from 23.92% (2006–07) to 19.91% (2008–09) / which resulted in substantial increase in revenue. During 2007-09, 62 numbers New Grid substations erected and capacity at 132 number Grid substations augmented besides the addition of 1070 circuit km. Transmission line and 149 MVAR shunt capacitors to State Grid.



Age Limit: 18 to 25 years as on 01-01-2016.

Qualifications:10+2 Passed.Any graduate

Application Procedure:


Online Application Source: https://cra288.pspcl.in/

Last date of Receipt of Online Application: 18-01-2017 at 4:00 PM.


Information visit: https://cra288.pspcl.in/cra288.pdf

Last Apply Date: 2017-01-31

Salary:  Rs. 15,000/- per month,
international level Player @ Rs. 20.000/- per month.

Industry:Oil and Gas / Energy / Power / Infrastructure

Functional Area: Other

Desired Candidate Profile
Please refer to the Job description above

Job Description:
Advertisement No.CRA-288/16

Emoluments: 
The players will be taken into PSPCL Sports Teams on Contract basis from year to year basis. Each such player will be paid a lump sum amount i.e. State Level Player @ Rs. 10,000/- per month, National Level Player @ Rs. 15,000/- per month, international level Player @ Rs. 20.000/- per month. The player joining on contract basis shall not be entitled to regularization of his services at am the stage.


Time: Full time

Shift: Regular

Location: Across India

Job mode: Normal

Apply Mode: Online

Apply Link:  Register

RECENT POSTS